Access Our 2013 Manufacturing and Distribution Software Guides Today!

The Brown Smith Wallace Distribution and Manufacturing Software Guides for 2013 are currently available.

You can download each one directly, or visit our main website to request a copy. Please follow the links below.



You can also request these guides, as well as all other materials, via our website: http://www.software4distributors.com/vendor/resources_index.aspx



Follow Us on Twitter Follow Us on Twitter

Monday, April 1, 2013

Request the Latest Distribution and Manufacturing Software Guides

The Brown Smith Wallace Distribution and Manufacturing Software Guides for 2013 are currently available.

You can download each one directly, or visit our main website to request a copy. Please follow the links below.






You can also request these guides, as well as all other materials, via our website: http://www.software4distributors.com/vendor/resources_index.aspx



Follow Us on Twitter Follow Us on Twitter

Wednesday, March 20, 2013

Is A Project Based Solution Right For Your Business?

If your business construct ships, buildings, oil platforms, bridges, infrastructure, complex equipment etc. then your processes are very different from a company that builds high volume products like cars or computers.

Could a Project Based Software Solution, which combines the integrated enterprise benefits of ERP, but are designed specifically to support the complex business processes of project centric organizations, be the right choice for you?

Visit the IFS website to view a webinar video that explores the differences in these business process requirements and discusses possible solutions.

The Brown Smith Wallace Distribution and Manufacturing Software Guides for 2013 are currently available.

You can download each one directly, or visit our main website to request a copy. Please follow the links below.




You can also request these guides, as well as all other materials, via our website: http://www.software4distributors.com/vendor/resources_index.aspx


Follow Us on Twitter Follow Us on Twitter

Monday, March 18, 2013

2013 Distribution & Manufacturing Software Guides Now Available

The Brown Smith Wallace Distribution and Manufacturing Software Guides for 2013 are currently available.

You can download each one directly, or visit our main website to request a copy. Please follow the links below.




You can also request these guides, as well as all other materials, via our website: http://www.software4distributors.com/vendor/resources_index.aspx


Follow Us on Twitter Follow Us on Twitter

Monday, March 11, 2013

Should Businesses Invest In Distribution Software?

Economic growth is on the horizon. For distributors, that means now is the time to invest in their own business and distribution software.

At the recent National Association of Wholesaler-Distributors executive summit, economist Alan Beaulieu of the Institute for Trend Research told attendees that he’s bullish about 2013, according to an article on the Modern Distribution Management website.

That means this is a good time to invest in wholesale distribution businesses, although it’s not a sign to go on a hiring spree. Instead, distributors should invest in technologies like distribution software, along with efficiencies and training that will make their workforce more productive.

Read more on the Advanced Distribution Today blog.

The 2013 Brown Smith Wallace Distribution and Manufacturing Software Guides are currently available.

You can download each one directly, or visit our main website to request a copy. Please follow the links below.



To request these guides, as well as our other materials, visit our main website at: http://www.software4distributors.com/vendor/resources_index.aspx

Follow Us on Twitter Follow Us on Twitter

Friday, March 8, 2013

Is Big Data And Analytics Impacting Distributors?

An recent article on the Modern Distribution Management’s website explains that while Big Data often is greeted with skepticism, it’s more than merely a different way of saying “analytics.”

This article highlights the importance of real-time data versus historic data. What would historical data tell us about this winter’s flu epidemic? Not nearly as much as real-time data, which tells the pharmacy how much product to have in stock and lets the hospital know how many patients to expect.

The message here is that analytics for wholesale distributors is about people, not the IT functions necessarily. Your ERP system must be able to capture the data, but it takes people to analyze and use it.

Read more on the Advanced Distribution Software blog.

The 2013 Brown Smith Wallace Distribution and Manufacturing Software Guides are currently available.

You can download each one directly, or visit our main website to request a copy. Please follow the links below.



To request these guides, as well as our other materials, visit our main website at: http://www.software4distributors.com/vendor/resources_index.aspx

Follow Us on Twitter Follow Us on Twitter

Wednesday, March 6, 2013

Distribution and Manufancturing Software Guides for 2013 Available Now

The Brown Smith Wallace Distribution and Manufacturing Software Guides for 2013 are currently available.

You can download each one directly, or visit our main website to request a copy. Please follow the links below.

 
You can also request these guides, as well as all other materials, via our website: http://www.software4distributors.com/vendor/resources_index.aspx


Follow Us on Twitter Follow Us on Twitter

Monday, March 4, 2013

Attending Convergence 2013? Take a Look at I.B.I.S.

Are you attending Convergence 2013, taking place in New Orleans, March 18th to the 21st.? If so, you won't want to miss the I.B.I.S. booth (#2522) in the Expo and Microsoft Solution Center.

I.B.I.S. will showcase solutions including Advanced Distribution Software and DynamicsCare. Stop by to learn more about their solutions and service offerings, plus enter for your chance to WIN a Microsoft Surface! I.B.I.S. will also be hosting a pre-release book signing of Mark Polino’s latest book, Building Dashboards with Microsoft Dynamics® GP 2013 and Excel 2013. A limited amount of free book coupons and Got Mark? t-shirts will be available on a first come basis. You won’t want to miss it!

Learn more and see the complete schedule of events on the I.B.I.S. website.

The new, 2013 Brown Smith Wallace Distribution and Manufacturing Software Guides, are now available.
You can download each one directly, or visit our website to request a copy. Please follow the links below.



To request these guides, as well as all other materials, visit our website at: http://www.software4distributors.com/vendor/resources_index.aspx

Follow Us on Twitter Follow Us on Twitter

Wednesday, February 27, 2013

Epicor Benefits Lumber and Building Material (LBM ) Businesses

Are you in the market for Lumber and Building Materials Software for your LBM Business?

Today, running a successful LBM business means managing complex, interconnected operations—purchasing and supplier relationships, inventory control, contract services, product delivery and more—all while keeping costs, manpower, and profit margins in line.

With everyday LBM operations firmly in hand, you'll want to address critical planning and decision-making activities. Epicor lumber and building materials software is there to help with a range of powerful business management software tools. No matter what shape the economy is in, maximum productivity is always the right approach. The full range of LBM software solutions from Epicor can help take you every step of the way, with fundamentals like accounting software, inventory software, and retail point of sale software, as well as professional estimating, dispatch and delivery, millwork, and construction services—all designed specifically for LBM businesses.

Learn more on the Epicor website. 

The new, 2013 Brown Smith Wallace Distribution and Manufacturing Software Guides, are now available.

You can download each one directly, or visit our website to request a copy. Please follow the links below.


To request these guides, as well as all other materials, visit our website at: http://www.software4distributors.com/vendor/resources_index.aspx
 

Wednesday, February 20, 2013

Webinar: What Every Industrial Distributor Should Know Before The Next ERP Upgrade

Advanced Distribution Software presents Hidden Risk: What Every Industrial Distributor Should Know Before The Next ERP Upgrade.

During this hour-long on-demand webinar, explore surprising facts about the industrial and electrical distributors who are waiting to upgrade or replace their ERP systems, including:

•  50 percent of distributors surveyed said they aren’t on a current release.
•  Difficulty or fear of conversion is the biggest reason keeping distributors from moving to the current ERP version.
•  60 percent said that the cost of the upgrade is also a barrier to change

To learn more and register, visit the Advanced Distribution Software website.

The new, 2013 Brown Smith Wallace Distribution and Manufacturing Software Guides, are now available.

You can download each one directly, or visit our website to request a copy. Please follow the links below.
 


To request these guides, as well as all other materials, visit our website at: http://www.software4distributors.com/vendor/resources_index.aspx

Monday, February 18, 2013

IFS Upgrade Program Brings Greater Value

The aim of IFS Upgrade is to help customers upgrade to the latest version of IFS Applications, thereby quickly taking advantage of new functionality to improve productivity and their competitive edge.

The concept behind IFS Upgrade is to keep the scope as tight as possible. The idea is to upgrade first and do the business improvements afterwards, resulting in a clear project scope from the beginning. Right after the technical upgrade business improvements are initiated and implemented at a pace suitable for the company.

IFS Upgrade is built on two pillars; IFS Technical and IFS Solution. With these processes and tools IFS significantly reduces the time it takes to upgrade, and time means money.

Read more on the IFS blog.

The new, 2013 Brown Smith Wallace Distribution and Manufacturing Software Guides, are now available.

You can download each one directly, or visit our website to request a copy. Please follow the links below.


To request these guides, as well as all other materials, visit our website at: http://www.software4distributors.com/vendor/resources_index.aspx

Follow Us on Twitter Follow Us on Twitter

Friday, September 14, 2012

Acumatica Partners with Accellos for Cloud ERP and Warehouse Management

Accellos and Acumatica, a provider of Cloud ERP and financial software, recently announced the availability of an integration between Acumatica Cloud ERP and AccellosOne Cloud WMS. The integration gives manufacturers, distributors, and retailers a seamless workflow between ERP and WMS across orders, inventory, and fulfillment processes.

The new interface uses Acumatica Web service integration tools and also includes certain extensions to Acumatica ERP using Acumatica Studio. The extensions facilitate immediate information transfers between ERP and WMS. This approach ensures that orders and inventory are kept in sync at all times across both systems. To read more about the features available, visit the Acumatica blog.

The Brown Smith Wallace 2012 Mid-Year Supplements are available. Visit our website to download your copy!


Friend Us on Facebook Follow Us on Facebook


Follow Us on Twitter Follow Us on Twitter

Wednesday, September 12, 2012

Cloud Computing: Debunking the Myths

For the past few years, the IT world has seen the increasing popularity of cloud computing, easily becoming 2012’s most talked about business software solution. More and more organizations have chosen to adopt the cloud to some extent. In Asia Pacific alone, a 2011 Frost & Sullivan survey indicated that cloud computing has emerged as the #1 priority for a significant number (38%) of businesses.

Cloud solutions and services come in various forms and pricing models, which may have caused some IT professionals to be sceptical on how this new technology may affect their businesses. Frost & Sullivan dispelled a few of the most common Cloud myths in its recent white paper. Visit the Cloud NetSuite blog to read more.

The Brown Smith Wallace 2012 Mid-Year Supplements are available. Visit our website to download your copy!


Friend Us on Facebook Follow Us on Facebook


Follow Us on Twitter Follow Us on Twitter

Monday, September 10, 2012

Demand Forecasting: The Next Big Wave of Innovation

Why care about demand forecasting?

When you forecast demand for finished goods, the financial consequences of inaccuracy can be huge. Forecast errors cause you to run out of stock. The result is missed sales and unhappy customers. Forecast errors can also cause you to carry too much inventory. You may have to borrow money to pay for the excess. You may also have to mark inventory down, donate it or even junk it just to get rid of it. Forecast error reduces profit. It can also reduce cash flow and increase the need for capital. Excess inventories yield a lower return on assets. Conversely, more accurate demand forecasts can reverse all of these problems. They can improve in-stock performance, increase revenue, improve customer satisfaction, reduce inventory investment, improve cash flow and improve return on assets.

Read more about the art and science of demand forcasting on the Blue Ridge blog.

The Brown Smith Wallace 2012 Mid-Year Supplements are available. Visit our website to download your copy!


Friend Us on Facebook Follow Us on Facebook


Follow Us on Twitter Follow Us on Twitter

Friday, February 12, 2010

SIFTing Through Your Technology Choices

There are many factors that must be taken into consideration when buying new technology. It's important to have a checklist or framework to use in order to be confident that you are making the "best" decision. The SIFT framework can be used for purchasing technology and helping you to organize all of the factors so that alternative choices can be compared. Suitablity, Investment, Functional Fit, and Technology are all critical factors in determining the best solution. To read more CLICK HERE to download article.

Other tools to help you in your software selection are the 20th annual Distribution Software Guide and 4th annual Manufacturing Software Guide.

Monday, January 12, 2009

Maximize the Value of Your ERP System by Jeff Gusdorf

ERP packages cost a lot of money - not just the initial investment but ongoing expenses for support, maintenance, training, new modules and consulting services. Every executive who is considering buying new software should have a plan for maximizing the value generated by their ERP package. The plan should recognize that the risk of failure exists and create the appropriate safeguards. This article provides an overview of the entire process and provides tips for promoting success and guarding against failure.

The typical ERP project takes three years. Some smaller or simpler projects will go faster and some more complex business will take longer. Regardless, every ERP project will go through five phases to arrive at the point where their new software system is stable and providing the anticipated benefits envisioned when the purchase was made. Those phases are:

Phase 1: Build the Foundation - Draft a project charter, identify benefits, build the business case, identify metrics, establish the steering committee and project team prepare the project plan, and assign roles and responsibilities

Phase 2: Software Selection - Determine the business requirements and conduct a defined process to identify and purchase the “best package”

Phase 3: Implementation and Go-Live - Implementing the software involves planning, installation, data conversion, process configuration, training and go-live

Phase 4: Stabilization - Resolve problems, make process and procedural changes, retrain and get additional training

Phase 5: Improvement - Implement 2nd phase modules, assess the implementation, continuous improvement

I. Building the Foundation:
Just as you wouldn’t start a construction project without blueprints and engineering drawings you shouldn’t start a project of this size and complexity without the appropriate plans in place. This is one of the most common mistakes we see – companies start a selection project by looking at software packages instead of formally defining the scope of the project.
  • Draft a project charter: This brief document provides a high-level summarization of the project. It outlines the business reason for conducting the project, defines the goals, objectives and some high level deliverables. The charter should also include a preliminary schedule, any budget constraints that have been established and any constraints or risks that have been able to be identified.

  • Identify benefits and metrics: Benefits realization is the process of ensuring that the ERP project produces the expected benefits after the system has been implemented and stabilized. Documenting this at the inception of the project keeps the project team focused and accountable over the life of this project while giving the steering committee the means to determine that the project has produced the benefits beyond successfully implementing the package, which can be a difficult enough challenge.

Without a formal planning process it is easy to lose track of the expected benefits and the ability to determine that the project actually produced those benefits. This process also clarifies that the responsibility for the realization of the benefits is typically the business process owner not IT. The Safe Quality Food Institute administers the program in the US and is responsible for managing the many components of this process. They publish the codes, train and license the SQF consultants and auditors, maintain the centralized database of certification and compliance records and provide on-going training.

Benefits can fall into the following categories:
1. Strategic

  • Support business growth/acquisitions
  • Build linkages to customers and/or suppliers

2. Organizational

  • Support change in structure
  • Decentralized management

3. Managerial

  • Improve decision making

4. Operational

  • Reduce costs
  • Improve customer service

5. IT infrastructure

  • Increase capacity
  • Reduce obsolescence risk

After identifying the benefit you will need to document the following information so that in the 1 to 2 years that it will take to achieve this benefit you will be able to determine if the benefit was realized. The benefits document needs to answer these questions:

  1. What is the benefit to be realized?
  2. Who will be responsible for producing the benefit?
  3. How is this process being measured (headcount, items, cost, etc.)?
  4. What ERP process has to be implemented to achieve this goal?
  5. What metric will be used to determine if the goal was achieved?
  • Establish Steering Committee and Project Team: The steering committee will consist of a small number of senior management who will approve the selection decision and approve the expenditure. This committee will review the work of the project team. The project team will consist of 6 to 10 department heads that understand the functional needs of their business units and departments and will ensure that the software selected will satisfy those requirements. During implementation the roles of these teams will expand and become more complex.

II. Software Selection: With the foundation in place for the project, your project team is ready to start the software selection process. The goal of the selection phase is to select package that “best” fits your business. “Best” is a blend of business process functionality without being so complex that implementation success is at risk, vendor knowledge in your vertical market, fit between your team and the vendor team, technology fit with your IT staff’s capability and price.

  • Project Initiation: Get this phase of the project off to a good start by conducting a formal kick-off meeting. The kick off meeting should be hosted by the senior management sponsor or the steering committee for the project. This meeting serves to introduce the team to the project charter and project benefits developed during the foundation stage. Review of the project plan and responsibilities helps team members incorporate this project into their schedules. Communicating the progress of the project to the organization is important throughout the project. Take a proactive approach to letting the organization know the status of the project. Developing a formal communication plan helps to create the discipline now which will pay off during the implementation.

  • Requirements Definition: Identify all business processes and process owners and users and involve those users in the discovery process. Interviews with those process owners to understand their needs, concerns and hopes for a new system are very important to prepare a complete set of requirements and to promote involvement and support in the user community. We use business process outlines to guide those interviews to ensure that we cover every process and every step of those processes. We will prepare process flowcharts where useful. Much of this work can be re-used during the design step of the implementation phase.

It is critical when defining business requirements that you review all processes and capture all information about the current state of these processes. It’s easy to overlook some of those processes if you aren’t careful. We have developed business process outlines to guide those interviews. These process outlines reflect what we believe to be standard process flows in most distribution companies. These outlines ensure that we cover every process and every step of those processes. Analyze the following areas when conducting discovery sessions:

  1. System Tools
  2. Productivity Tools
  3. Product Management
  4. Supplier Management
  5. General Ledger
  6. Accounts Payable
  7. Accounts Receivable
  8. Commissions
  9. Treasury
  10. Fixed Assets
  11. Budgeting
  12. Payroll & Expenses
  13. Inventory Management
  14. Procurement
  15. Product Management
  16. Customer Management
  17. Channel Management
  18. Marketing Materials
  19. Campaign Management
  20. Manufacturing
  21. Lead Management
  22. Sales Force Automation
  23. Quoting
  24. Sales
  25. Retail/Counter Sales
  26. eCommerce Website
  27. Customer/Supplier Portals
  28. Service
  29. Warehousing
  30. Logistics
  • Long-list to Short-list to Finalist: The horse-race component of this process involves identifying a large (7-12 is large enough) group of software vendors who have the potential to supply the software solution for your business. Use the requirements to determine which vendor can satisfy them the “best”. “Best” will be different for every business; we determine best by looking at the mix of process functionality, vendor knowledge in your vertical market and their stability and strength, technology and price.

  • Finalist Due Diligence: Once the finalist has been selected you still have to negotiate an agreement. Conduct reference phone calls and client site visits, negotiate final price discounts and negotiate the contract. We strongly suggest that you conduct a pre-implementation meeting prior to signing a contract so that you fully understand the implementation methodology your selected vendor is going to use.

III. Implementation: You have probably devoted 6-9 months to get to this point and are confident in your selection of the software package and the vendor that will help you implement the software. Now - the real work begins. This phase of the project has the greatest risk and requires that the steering committee is paying close attention. We have seen projects with services estimates of $200,000 become $500,000; or estimates of $1M and 1 year become $2.5M and 2 ½ years Watch carefully to make sure your project doesn’t wander off course; it can happen quickly. You may want to have an independent party provide project monitoring since the project team is so busy with the actual implementation.

  • Plan: The vendor implementation team will work with the project team to put the implementation plan together. This will seem a lot like the planning done in the Foundation stage. Make sure that the sales team hands off everything that they have learned during the software selection stage; you can reduce your costs by doing so. If they haven’t made a good hand-off, alarm bells should go off!

  • Assess/Design: The vendor team will develop a detailed understanding of your business processes to be used when configuring the software. They will develop a data conversion plan; don’t under estimate the value of cleaning up your master file data. Don’t spend the money to convert transaction history; just keep your old application available. Review and decide how modifications that you identified earlier in the process will be prioritized. Review and decide how any other software products will be integrated with the new ERP system. Make sure the benefits statements and the metrics are incorporated into this process otherwise you will not maximize the return on your investment.

  • Build/Test: This is the critical phase where the software is configured for how your business wants the software to work and testing is done at a departmental level and in the conference room pilot for all users. User training occurs during this phase so users are prepared to test the software. Your team will conduct multiple conference room pilots where the software is tested. The quality of your go-live experience is dependent on how rigorous you are in this testing. Don’t short-cut this and repeat it until your satisfied.

  • Go-Live: This is the big moment when all of the hard work is put to the test. Usually starting on a Thursday, all transaction processing is stopped. All data is converted following the scripts created previously. End-users, with support of the vendors’ consultants and the project team start to use the new system to process real business. This is always a challenging period but if you have done your homework you’ll make it through.

IV. Stabilization: Congratulations! You have survived the go-live process and the first few months of using the new system.

  • Project team transfers responsibility to every-day user: The project team has lived with the new system and has worked to get to this moment. The team will be disbanded and members will return their focus to their own functional responsibilities. Reliance on outside consultant will be reduced or eliminated. All users must now operate without their hand-holding. It’s important that users have accepted the new system. Be on the look-out for users that need more training or re-training so that they can use the system with confidence.

  • Process changes: During this period it will become apparent if any of the process decisions that were made were incorrect. The configuration settings will be changed to adjust the processes. Data entry screen layouts, inquires, reports can be modified to make the user more efficient. Users will also personalize their interaction with the software.

V. Improvements: With the new system stable, this is a good time to bring out the benefits document again and audit the benefits of the new system. This is a very valuable exercise to conduct. It will reveal where benefits are being received and where they are being missed. It will also reveal if certain departments fell short of the goals and need more training or help in using the system. You may also embark on implementing second phase modules that you didn’t have the resources for in the initial implementation of the software.

A Final Thought: Buying and implementing software is expensive, time-consuming and risky. Technology related products and companies change at a rapid pace. To access more information and resources about software selection and our consulting services check out our website www.software4distributors.com.

About The Author: Jeff Gusdorf, CPA is a Principal in Brown Smith Wallace’s Consulting Group. He is the managing consultant and is responsible for IT strategic consulting, software research and evaluation. Jeff has more than 20 years’ experience as a financial manager and technology consultant in the manufacturing, distribution and service sectors.

About The Brown Smith Wallace Consulting Group: The Brown Smith Wallace Consulting Group has been serving the distribution community for more than 20 years through the publication of the Distribution Software Guide, speaking at industry programs, giving free telephone advice to distributors and providing fee-based consulting services to companies who need help selecting the best software packages for their business.

Monday, November 3, 2008

ISSA's Guide

We encourage you to take a look at the link below, to view our Endorsing Association's annual distribution software guide.

This guide helps to paint a better picture of the computer systems used in the industry. One of the surprising things found, is that there are still a lot of distributors running their businesses with off-the-shelf programs like QuickBooks and Peachtree. There are a variety of reasons for this.

Most sophisticated enterprise-resource-planning (ERP) systems are still too expensive for many distributors. Profit margins are tight (as always), and new computer systems just keep costing more. In some ways, that seems counterintuitive: You would think that software companies could lower their prices once they’ve recouped the cost of their initial investment. But in reality, software companies need to continually invest in research and development to stay competitive and expand their customer base.

Another important reason a goodly number of distributors still run their businesses with off-the-shelf programs is that these products are becoming quite sophisticated. What started out as a simple accounting program on personal computers has grown into a robust business solution with a full suite of products. These systems now handle functions like payroll, point of sale, EDI, and warehouse management, just to name a few. About the only thing that hasn’t changed is that they still run on personal computers (although QuickBooks recently introduced a version called QuickBooks On-Line that you can use with nothing more than a Web browser).

And, of course, the users are becoming more sophisticated, also. Ten years ago, people were looking for turnkey solutions. They wanted the software company to install the system, do the training, and provide comprehensive ongoing support. Today’s user is often unafraid to install his or her own software or handle his or her own system configuration.

But what about the big ERP systems? As usual, the large software companies are still swallowing the smaller ones. Rarely do these acquisitions result in a better product or better services for the customer.

If you are looking to upgrade your computer systems this year, should you look at the bigger ERP systems? Absolutely—see the guide by clicking on the link below, listing only those systems that have some real experience serving the cleaning industry.

As for the off-the-shelf software like QuickBooks and Peachtree, they can be a great alternative—although they still aren’t powerful enough for a sophisticated warehouse with bar code scanning and lot control. They also require a tremendous time investment to properly configure them to your unique business processes, especially in a multibranch environment.

Download the Sixth Annual ISSA Today Software Guide